+44 (0)20 7510 2485
enquiries@3crisk.com

3cRisk

  • Homepage
  • About Us
  • News
  • Services
  • Brochure
  • Clients
  • Contact

Imperial College

  • 
  • Imperial College
Overview

CLIENT: IMPERIAL COLLEGE
PROJECT DURATION: VARIOUS PROJECTS SINCE 2007

Rolling refurbishment and redevelopment of their existing campus in Kensington to include the following works:

Imperial College London AMP Phase 1 & 2 - Demolition, asbestos removal, new steel beams, façade to deliver a mixture of laboratory, workshop, office, teaching and support space to allow the occupants of the North and South blocks of the Mechanical Engineering (MEng) Building to decant from their current locations. A new Break – Out Student Study space (BOSS) on Level 2, Composite Suite and Autoclave on Level 1 are also included.

ICL-Sherfield Level 0 - Excavations,  Asbestos Refurbishment and Demolition Survey to ensure no Asbestos Containing Materials (ACMs) are present. Providing a new bar and catering facilities, toilets and facilities requiring DDA accessible with improved access and lighting, including new electrical wiring, ceilings with painting and decoration.

We are pleased to have had the framework agreement renewed in 2013 to continue to deliver our services to Imperial College.

13th August 2014
Imperial College
0 likes
+
Contact

Corporate office address:
8th Floor, 64 Victoria Street, London, SW1E 6QP

T: +44 (0)20 7510 2485
E:
enquiries@3cRisk.com

Pages
  • About Us
  • Clients
  • Contact
  • Homepage
  • News
  • Services
Latest Tweets
  • RT @Ladder_Tweet: Today's #LadderIdiots entry looks like a classic: facebook.com/ladderassociat… http://t.co/BHerDjaEkM
  • RT @BritSafe: Devolution of #healthandsafety regulation to #Scotland could lead to different #OSH standards across GB http://t.co/aGHhxUfdQ…
  • RT @H_S_E: Whilst we wait for the final results from #safersites you can view all the campaign material on Pinterest here http://t.co/JW4jQ…
Social Media


© 3cRisk 2014

Privacy PolicyTerms & ConditionsSitemap